The SUY line has been designed by Fulvio de Simoni, with naval architecture from Studio Arrabito. Constructed in steel, the SUY 135 yacht pairs a more typical superyacht aesthetic with incredible world-cruising capability.
Static and dynamic testing of the hull, hull lines and appendages was performed at the MARIN Maritime Research Institute in the Netherlands, simulating seakeeping in extreme navigation conditions.
The clever naval architecture, engineering and internal compartmentation are designed to allow full internal and external customisation by the clients. Small structural modifications to adapt the hull are also possible.Yacht SUY 135’s proposed interior layout features a main and upper deck connected via a raised deck with a short staircase, and there are five guest cabins. The accommodation comprises a 56 sqm owner’s suite – located on the main deck – and four en suite cabins on the lower deck. There is separate accommodation for the captain and seven crew.
Buyers can customise the interior design to their liking, with other arrangement options offered by the shipyard including a gym suite and spa/sauna, and different cabin configurations thanks to her excellent internal volume. Each unit can be adapted to reflect the needs of the client.The SUY 135’s exterior spaces include a 40 sqm veranda with an alfresco dining space that’s sheltered from the elements and made more private thanks to its position beneath the raised deck, and a 35 sqm beach club with transom Jacuzzi. On the sun deck, a second Jacuzzi is positioned forward to make the most of the elevated views, there’s also a bar counter with stools, casual dining table, and aft-facing sun pads.
A sizeable transversal tender garage stows a 7-metre RIB and leaves plenty of space for water toys.
The SUY 135 yacht has a range of 4,000nm at her economical 10 knot cruising speed and a top speed of 15 knots. Zero-speed stabilisers ensure heightened levels of comfort.Offered as a brand-new custom project, the 44-metre SUY 135 represents a rare opportunity to acquire a new build from a trusted Italian shipyard—with already two units sold and delivered in H1 2026. Delivery time: 24 months from signature.